GRID DEFICIT WARNING: Total Datacenter Load exceeds Substation Headroom. Compute throttle applied to maintain electrical stability.
Theoretical Peak ExaFLOPs
197.90 EF
FP8 Dense Compute
Effective Training ExaFLOPs
89.45 EF
45.2% Effective MFU
Total Datacenter Power Load
95.20 MW
IT Load: 85.00 MW
Training Run Duration
23.3 Days
1.80e26 Total FLOPs
Grid Substation Transformer Headroom
63.5% Utilized (54.8 MW Reserve)
| Simulation Metric | Calculated Value | Engineering Constraint & Scaling Basis |
|---|