Paso Cristo Redentor / Los Libertadores Transit Dispatch

Phase 1: Reopening
Hourly Throughput 140 trucks/h Pacing Target: 150
Argentina Queue Drain 6.1 hrs 850 trucks in Uspallata
Chile Queue Drain 4.4 hrs 620 trucks in G. Vieja
Safety Margin Index 88 / 100 Moderate Risk
Critical Bottleneck Caracoles Switchbacks (Chile Side) Icing Grade Hazard
Active Corridor Clearance Protocol:Alternating Escort Convoy
Cristo Redentor Tunnel Temp (3,200m):-4.0°C (Active De-icing)
Snow Plow Fleet Active:6 Heavy Blowers / Scrapers