Circuit + airflow verifier

Find the constraint before adding heat.

Turn a miner manifest into branch-circuit, site-capacity, and ventilation evidence. The bundled case uses the shed post's own planning numbers.

MinerWattsCircuitFan CFM

ASIC SHED CAPACITY RESULT

Awaiting calculation
--A

Load the shed sample to reveal the first constraint.

--Installed exhaust
--Intake target

Results use local arithmetic only. No equipment data leaves this browser.

What the sample proves

Whole-site headroom can hide a failed branch.

Worked case. Two 6,800 W miners total 13,600 W. At 240 V that is 56.67 A on circuit A. A 30 A breaker has a 24 A planning envelope at 80%, so this assignment reaches 236.1% of that envelope.

  • The 2x intake value is the source author's rule of thumb, not engineered vent free area.
  • MERV rating alone cannot predict delivered CFM; filter loading and static pressure are not supplied.
  • This planning aid does not replace an electrician, code review, conductor sizing, voltage-drop study, or fire design.
Super generates helpful tools and automates fact-checking across the internet proactively. If you enjoyed this tool, build your own with Super and share it with a friend.