LIVE TELEMETRY

BepiColombo MTM Staging & Deep Space Telemetry Console

ESA/JAXA Mercury Planetary Orbiter + Mio vs Mercury Transfer Module (MTM)
2D Relative Staging Separation Dynamics
STATUS: NOMINAL CLEARANCE
TARGET: MPO / Mio Composite
JETTISON: Spent MTM Stage
REL SEPARATION: 126.0 m
CLEARANCE SPHERE (120m): CLEAR (T+300s)
COLLISION PROB: < 10⁻⁷
Separation Impulse (Δv) 0.42 m/s
Attitude Push-off Offset (θ) 0.0°
Simulation Elapsed Time 300 s
Cebreros Deep-Space Station (DSA 2) Link Telemetry
CARRIER: PHASE-LOCKED
One-Way Light Delay
8.33
min (499.8 s)
Distance to Earth
1.002
AU (149.9M km)
Cebreros Dish
35.0
metres beam aperture
Carrier Freq (X-band)
8.420
GHz downlink
Received Carrier (Pc/N0)
48.4
dB-Hz (Nominal)
Doppler Shift (Downlink)
+11.8
kHz relative drift
Mission Milestone Time Track (CEST - Sep 3, 2026) 15:53 CEST
Cebreros Antenna Elevation 42.5°
Spacecraft Transmitter EIRP 78.0 dBW
Telemetry Sequence Flight Log (Deterministic Audit Trail)
4 EVENT ENTRIES
Timestamp (UTC/CEST) Milestone Stage Rel Distance (m) Rel Velocity (m/s) Light Time (OWLT) Carrier SNR (dB-Hz) Cebreros Lock Envelope Status