SIM ACTIVE // FID TARGET Q4 2027

Pathways Alliance CCS Trunkline Corridor Workbench

Athabasca Regional Hub ➔ 400km Dense-Phase Line ➔ Cold Lake Saline Aquifer Sequestration
Presets:
Total Capture Rate 6 Nodes
12.4 Mtpa
33.9 kt/d CO2 Mass Flow
Levelized Cost (LCOCS) CAD $/t
$94.80
Gross $148.50 / Net after ITC
Project Unlevered NPV 10% Disc
$3.42 B CAD
Project IRR: 14.8%
Net CAPEX Requirement Phase 1
$9.18 B CAD
Gross: $16.5B | ITC Aid: $7.3B
Trunkline Terminal P @ Cold Lake
9.42 MPa
Dense Supercritical (Safe > 8.0 MPa)
Late-2027 FID Score Readiness
76 / 100
PROCEED WITH CONTINGENCY
400-Kilometer Regional CO2 Trunkline Topology & Facility Feeder Network
Click facility cards below to activate/deactivate capture injection points
0 km (Ft McMurray) 100 km 200 km (Lac La Biche Junction) 300 km (Booster Station) 400 km (Cold Lake Hub) BOOSTER PUMP +2.8 MPa Suncor Base/Firebag 3.8 Mtpa CNRL Horizon/AOSP 3.4 Mtpa Imperial Kearl 1.9 Mtpa Cenovus Foster/Christina 2.1 Mtpa MEG Energy 0.7 Mtpa ConocoPhillips Surmont 0.5 Mtpa Cold Lake Sequestration Hub Deep Basal Aquifer (1,500m) Capacity: >1.1 Gt CO2
1. Pipeline Hydraulics & Dense-Phase CO2 Engine
VELOCITY: 1.62 m/s
Trunkline Outer Diameter (OD) 24 inches (DN600)
Inlet Compression Pressure 14.5 MPa
Ambient Ground Soil Temp 4 °C (Permafrost/Clay)
Midpoint Booster Compression 2.8 MPa
HYDRAULIC PRESSURE PROFILE [0km ➔ 400km] DENSE PHASE BOUNDARY: 7.38 MPa (Crit P)
2. Fiscal Policy, Carbon Offsets & Grants
CFD MONETIZATION
Federal CCUS ITC (Capture Equip) 50% Refundable
Federal CCUS ITC (Pipe/Transport) 37.5% Refundable
Alberta Carbon Price / Offset Value $170 CAD / tonne
Discount Rate (WACC) 9.5%
Fiscal Stream Rate / Basis Annual CAD $/t CO2
3. LCOCS Abatement Matrix & Sensitivity
25-YR ASSET LIFE
CAPEX Inflation Stress 0% Delta
Electricity Power Tariff (Pumping) $85 / MWh
LCOCS SENSITIVITY TORNADO MATRIX ($/tonne CO2 abated delta from base)