Total Capture Rate 6 Nodes
12.4 Mtpa
33.9 kt/d CO2 Mass Flow
Levelized Cost (LCOCS) CAD $/t
$94.80
Gross $148.50 / Net after ITC
Project Unlevered NPV 10% Disc
$3.42 B CAD
Project IRR: 14.8%
Net CAPEX Requirement Phase 1
$9.18 B CAD
Gross: $16.5B | ITC Aid: $7.3B
Trunkline Terminal P @ Cold Lake
9.42 MPa
Dense Supercritical (Safe > 8.0 MPa)
Late-2027 FID Score Readiness
76 / 100
PROCEED WITH CONTINGENCY