INSARAG SECTOR TRIAGE & COLLAPSE VOIDS
Mountain Corridor (Central Colombia)
SEC-A-NORTE (Pancake Concrete)
Priority 2 (Secondary)
Survival Viability Index:
18%
SEC-B-CENTRO (Masonry Lean-To)
Priority 3 (Monitor)
Survival Viability Index:
12%
SEC-C-SUR (V-Shape Concrete Void)
Priority 1 (Primary Rescue)
Survival Viability Index:
34% (Critical)
ENVIRONMENTAL SURVIVAL ENGINE
Day 6+ Decay Model
6.0 d
28°C
75%
AID THROUGHPUT & CAPACITY DISPATCH
Daily Target Metrics
40,000 L
Potable Water / Day
450 Units
Shelter Tents
320 Pts
Field Triage / Day
Est. Extraction Window (Top Void):
28 Hours Remaining
OPERATIONAL SITREP (INSARAG STANDARD)
INITIALIZING COLOMBIA EOC COORDINATOR...
[DAY 6] Active extraction at SEC-C-SUR (V-shape void).
[ALERT] Potable water distribution corridors clearing.
[STATUS] Optimal dispatch configuration verified.