LIVE EOC Colombia Earthquake USAR & Aid Logistics

Timeline: Day 6 (144 hrs) Magnitude: 6.8 M_w Status: INSARAG Phase 2-3
INSARAG SECTOR TRIAGE & COLLAPSE VOIDS Mountain Corridor (Central Colombia)
SEC-A-NORTE (Pancake Concrete) Priority 2 (Secondary)
Est. Trapped: 12 Acoustic / Dogs: Signals / 2 Hits Water Access: No (Void Dry)
Survival Viability Index: 18%
SEC-B-CENTRO (Masonry Lean-To) Priority 3 (Monitor)
Est. Trapped: 8 Acoustic / Dogs: Silent / 1 Hit Water Access: Yes (Pipe Leak)
Survival Viability Index: 12%
SEC-C-SUR (V-Shape Concrete Void) Priority 1 (Primary Rescue)
Est. Trapped: 15 Acoustic / Dogs: Tapping / 3 Hits Water Access: No (Extreme Debris)
Survival Viability Index: 34% (Critical)
ENVIRONMENTAL SURVIVAL ENGINE Day 6+ Decay Model
6.0 d
28°C
75%
AID THROUGHPUT & CAPACITY DISPATCH Daily Target Metrics
40,000 L
Potable Water / Day
450 Units
Shelter Tents
320 Pts
Field Triage / Day
Est. Extraction Window (Top Void): 28 Hours Remaining
OPERATIONAL SITREP (INSARAG STANDARD)
INITIALIZING COLOMBIA EOC COORDINATOR... [DAY 6] Active extraction at SEC-C-SUR (V-shape void). [ALERT] Potable water distribution corridors clearing. [STATUS] Optimal dispatch configuration verified.
Enjoy this tool? Build your own with Super