AI Data Center Power & Supply Chain Risk Auditor

β€œU.S. hyperscalers are racing to build multibillion-dollar data centers for AI β€” with Chinese firms supplying a large portion of core parts. American reliance on China for key components used to power data centers is coming under increasing scrutiny as Washington and Beijing...”
At-Risk CapEx
$2.89B
Out of $8.50B 1-GW campus buildout
Delayed Megawatts
420 MW
Capacity stalled beyond codex schedule
Avg Lead Time Extension
+52 wks
Severe electrical substation delays
Highest Bottleneck Tier
Step-Up Transformers
71% China concentration
Est. Domestic Mitigation Cost
$1.15B
Capital premium to friendshore BOM

1-GW Campus Power & Thermal Topology Map

Select any electrical tier below to inspect supplier shares, lead-times, and alternative vendor hubs.

China US Domestic Europe Allied Asia
Component Deep-Dive & Override

Step-Up Transformers & Substation Switchgear

Primary high-voltage grid interconnection equipment (115kV/230kV step-down to 34.5kV medium voltage).
CRITICAL VULNERABILITY: 71% CHINA
Dominant Chinese Suppliers:
Baoshan Iron & Steel, TBEA Co., China XD Electric, Sungrow
Viable Western/Allied Replacements:
Hitachi Energy (Japan/US), Siemens Energy (DE), Schneider Electric (FR), Eaton (US)

Hardware Bill-of-Materials & Bottleneck Audit Table

Calibrated against global hyperscaler procurement logs and power delivery timelines.

Hierarchy Stage Component Tier China Supply % Current Baseline Lead Time Geopolitical Extension CapEx Weight At-Risk CapEx ($M) Delayed MW Domestic Alternatives

Saved campus component exposure arithmetic

Read the explanation

Saved campus capital eight point five billion times transformer weight twenty-two percent allocates one point eight seven billion dollars to that tier. Bars compare whole campus and allocation at fifty pixels per billion dollars. Supplier shares and costs are saved assumptions rather than current verified procurement. Allocated one point eight seven billion multiplied by saved China supply share point seven one gives one point three two seven seven billion. Bars compare tier capital and computed exposure at three hundred pixels per billion dollars. This is modeled accounting exposure, not a measured disruption probability or guaranteed loss. Saved one gigawatt converted to one thousand megawatts times tier delayed factor point four two times share point seven one gives two hundred ninety-eight point two, rounded to two hundred ninety-eight. Bars compare campus capacity and unrounded delayed estimate at point five pixels per megawatt. Complete native full bill-of-materials JSON/reset and footer placement preserved; causal supply risk unproved.

Super generates helpful tools and automates fact-checking across the internet proactively. If you enjoyed this tool, build your own with Super and share it with a friend.