Wellfield Stress
0.18 m
18.4 m³/day consumption
Substation Headroom
48.0%
Ontario Queue: 7,000 MW
OT Cyber Resilience
94/100
CCCS / Purdue Model Verified
Bylaw Readiness Index
COMPLIANT
0 Critical Blockers
Hydrogeological Aquifer Drawdown Simulation
Safe Drawdown Profile
Simulated cone of depression from facility relative to Orangeville municipal production wellfield (100% groundwater reliance).
Regional Substation & Ontario Grid Draw
Queued Interconnection
250 MW Transmission Feeder allocation vs peak regional Dufferin County summer loads.
Cross-Boundary Municipal Assessment Protocol
Motion: Clr. Tess Prendergast (Aug 2026)
| Jurisdiction / Instrument | Required Statutory Action | Threshold & Standard | Current Status |
|---|