Grid Load Impact Simulator AC Power Flow v2.4

System Frequency
50.00 Hz
Total Generation
4,600 MW
Active Load
3,850 MW
Reserve Margin
19.5%
Total Grid Loss
42.8 MW
Topology Legend
Generation Substation (Hydro/Wind)
Regional Demand Substation
Invercargill Datacentre Node
Normal Transmission Flow (<80% Limit)
Thermally Congested / Overloaded Corridor
Enjoy this tool? Build your own with Super