Procurement Stack Inputs
NATO Member
Architectural Subsystem Layers
Intelligence Fusion & OS
Palantir AIP/Foundry
Sensor & Platform Avionics
Lockheed F-35 C2
Tactical Cloud & Satellite Link
MIL-SATCOM / Starlink
Dependency & Lock-in Dynamics (D3)
FLOW MAP| Subsystem Layer | Transition Cost | Friction Horizon | Interoperability Penalty | Sovereignty Risk |
|---|
Sovereignty & Cost Impact
SEVERE RISKTotal Decoupling Cost
$3,630M
2.51x Annual Supplier Spend
Replacement Duration
6.8 Years
Weighted engineering & recertification timeline
Allied Interoperability Status
Severe (NATO Link-16/MADL Degraded)
Sovereign replacement induces protocol desync during transition window
Low direct spend masks massive sovereign inertia: decoupling exceeds 250% of direct annual vendor spend with high mission-degradation risk during transition.