Democratic Transition Stress & Guardrail Simulator

SIM: RUNNING
Scenario Benchmark
Applied Stress Vectors
Certification Refusal 85%
Executive Pressure 90%
Litigation Volume 70%
Disinformation Load 60%
Counterfactual Interventions
Governing Legal Frame: 3 U.S.C. § 5 (Electoral Count Reform Act of 2022), U.S. Const. Amend. XX, Presidential Transition Act § 3(c).
INSTITUTIONAL PILLAR TOPOLOGY & STRESS FLOW DRAG TO REPOSITION | CLICK NODE TO INSPECT
1. State CanvasPassed
Dec 11 (Statutory Cert)
2. ECRA ReviewActive
Dec 16 (Federal 3-Judge)
3. Joint SessionGuarded
Jan 6 (VP Ministerial)
4. InaugurationTarget
Jan 20 (20th Amend)
Systemic Telemetry
SYSTEMIC RESILIENCE INDEX
68.4
Moderate Guardrail Buffer
CASCADE STATUS
Contained at Judicial Review
TRANSITION OUTCOME
Delayed Resolution with Constitutional Settlement
Identified Vulnerabilities
Active Node Details
Click any node in the topology to inspect its statutory mandate, resistance ceiling, and current stress load.
Enjoy this tool? Build your own with Super