Official environmental, cultural, and mechanical engineering summary for the proposed UK-Ireland Subsea Power Grid Interconnector alignment.
| Parameter |
Value |
| Baseline Budget Target |
£430,000,000 |
| Calculated Capital Cost (CapEx) |
£430.0M |
| Total Route Corridor Length |
185.0 km |
| HVDC Transmission Loss (at 500MW) |
3.2% |
| Cable Mechanical Strain Rating |
Optimal / Safe |
| Freshwater West (Dobby Beach) Clearance |
Compliant |
| Bronze Age Coastal Tumuli Clearance |
Compliant |
| Heritage Protection Score |
92 / 100 |