Elephanta Hydraulic Simulator March 2026 ASI Discovery

Hydraulic Levers BASALT SYSTEM
Annual Monsoon 2200 mm
Catchment Area 4,500 m²
Reservoir Depth 5.0 m
Basin Stone Steps 20 Steps
Daily Water Demand 35,000 L/day
Silt Filtration Baffles
Presets
365-DAY ANNUAL SEASONAL CYCLE Day 120 (Monsoon Peak)
Hydro-Telemetry LIVE BALANCER
Peak Storage Capacity
1,875,000 L
Dry Season Reserve Survival
245 Days
Sustainable Year-Round Balance
Water Purity / Silt Index
94%
March 2026 ASI Excavation: Prior to recent archaeological digs 5 meters below ground level, Elephanta Island's massive 20-step T-shaped stone reservoir remained silted and hidden. Basalt blocks were ferried across open sea to form a precision stepped basin that minimized surface evaporation wave drag while trapping heavy silt.

Elephanta Reservoir Hydro-Engineering Audit

Peak Storage Liters
1,875,000 L
Dry Season Days Survived
245 Days
Water Purity Index
94%
Storage Balance Status
Sustainable Year-Round Balance
Enjoy this tool? Build your own with Super