Eternal Sunshine Tour Incident Reconstructor

Billboard Source Grounding
Venue: Intimate Arena
Tour Milestone: Final Show (Encore Wrap)
Status: Resolved Safely
Stage & Backstage Telemetry Scrubber
EVENT SEQUENCE (SHOW WRAP TO RESCUE PROTOCOL) Index 3 / 6 Selected
STAGE LEVEL (L2)
BACKSTAGE (L1)
TUNNEL (B1)
LOAD-IN (B2)
CAB STUCK
Shaft Position L1 / B1 Interlock
Brake Interlock ENGAGED
Tension Cable 14.2 kN (Nominal)
Cab Ventilation Auxiliary Fan ON
Occupants Ariana G. + Security
Intercom Line Active & Stable
Show Leg
Final Night (Wrap)
Encore Time
23:20 PM
Entrapment Duration
25 Minutes
Outcome
Safe Extraction
Incident Telemetry & Protocol Inspection
Phase: Dispatch
23:45:00 Elevator Sensor Trip

Cab Interlock Tripped Between L1 and B1

Immediately following final bow and backstage egress, VIP freight lift hoist stops. Over-speed governor safety contacts lock cab into guide rails safely.

Telemetry: Safety Circuit Breached Brake Status: Clamped Ariana Comms: Direct Dispatch
RESCUE & SAFETY CHECKLIST
Production Incident Dossier
Status: Fully Verified • Ready for Export
Source grounded on Billboard post-show report. Reconstructs elevator safety interlock, arena engineering protocol, and verified safe egress.
Enjoy this tool? Build your own with Super