EU Grid Dispatch Stress Simulator LIVE SOLVER

Region & Load Inputs
+22.5 GW
185 GW
35%
75%
Generation Fleet Capacities
120 GW
55 GW
Regional Grid Flow & Dispatch Nodes Interactive drag / real-time balancing
Instantaneous Merit-Order Dispatch Stack
Renewables
Nuclear
Hydro
Gas Peaker
Coal
Deficit / Unmet
Grid Telemetry & Economics
Reserve Margin
+8.2%
Spot Price
€84/MWh
Carbon Intensity
142 g/kWh
Total Load Demand
207.5 GW
Grid Stability Rating STABLE
Central Europe (DE/FR/NL/BE) grid running at 207.5 GW total demand. Reserve margin at +8.2% with marginal clearing price €84/MWh and 142 g CO2/kWh emissions.
Enjoy this tool? Build your own with Super