TRACKING CONTINUOUS: DUAL-LOCK
SATELLITES IN FOV:
3 Satellites
GROUND RADIUS:
T+ 04:20
1x Live
Flatellite
MWIR Sensor Cone
Hypersonic Threat
Stereoscopic Beam
Walker 48/6/1 @ 550 km
Instant Coverage
98.4%
Global target lat
Tracking Gap (Max)
14.2 s
Low handoff loss
Stereo Redundancy
2.6x
Dual-Satellite LOS
Mean Revisit
1.8 min
Target plane interval
LIVE THREAT INTERCEPT & HANDOFF
LOCKED
[T+00:00] Constellation initialized in Walker Delta grid.
[T+01:15] Hypersonic glide trajectory Mach 8.5 active.
[T+02:40] Sat-P2-04 acquired primary IR thermal bloom.
[T+03:10] Stereoscopic handoff to Sat-P3-01 confirmed.
| Total Spacecraft Needed: |
48 |
| Flat-Pack Stacking (per Fairing): |
16 sats |
| Neutron Launches Required: |
3 launches |
| Constellation Unit Cost: |
$6.2M / sat |
| Contract Allocation Used: |
$297.6M / $397M |
| Replenishment Reserve: |
$99.4M |