Florida Electric Rate & Thermal Load Analyzer TECO Rate Shock Audit

Estimated Monthly Bill $0.00 + $0.00 in surcharges & fuel
Monthly Energy Usage 0 kWh Tier 1 Threshold (1000 kWh)
Central AC Thermal Load 0 kWh 0% of total consumption
Effective Rate per kWh $0.000 Base + Fuel + Storm Surcharges
Monthly Consumption vs Multi-Tier Rate Jump D3.js Dynamic Tier Simulation
Major Household Appliance Load Schedule
Appliance / Device Wattage (W) Hours / Day Monthly kWh Est. Cost Action
Itemized Bill Shock Diagnostic Audit Report TECO Florida Structure
TAMPA ELECTRIC (TECO) ESTIMATED RECEIPT
Base Customer Facility Charge: $15.00
Tier 1 Energy Charge (≤1k kWh): $88.00
Tier 2 Energy Charge (>1k kWh): $0.00
Fuel Recovery Surcharge: $0.00
Storm Cost Recovery Rider: $7.50
TOTAL MONTHLY UTILITY OBLIGATION: $0.00

Thermodynamic Mitigation Pathways

Loading thermodynamic simulation diagnostic...

1°F Setpoint Shift:
Saves ~$0.00/month
Tier 2 Avoidance:
Within Tier 1 limit