GLOF Hydro-Dynamic Status: Overtopping active at terminal moraine rim (Elevation 4,920m). Hydrostatic scour accelerating breach channel expansion into downstream Tamor/Bhotekoshi gorge.
Dam & Valley Mechanics
18.5M m³
45 m
1.2 m
0.25M m³
22 km
Peak Discharge (Q_p)
4,250 m³/s
Wave Velocity
7.8 m/s
Arrival Window
2.8 hrs
Evac Lead Time
108 min