Himalayan Glacial Lake Overflow & GLOF Simulator

China-Nepal Border Moraine Dam Breach Hydraulics & Downstream Inundation Routing

Transboundary Flood Warning: Level 3
GLOF Hydro-Dynamic Status: Overtopping active at terminal moraine rim (Elevation 4,920m). Hydrostatic scour accelerating breach channel expansion into downstream Tamor/Bhotekoshi gorge.

Dam & Valley Mechanics

18.5M m³
45 m
1.2 m
0.25M m³
22 km
Peak Discharge (Q_p) 4,250 m³/s
Wave Velocity 7.8 m/s
Arrival Window 2.8 hrs
Evac Lead Time 108 min
Enjoy this tool? Build your own with Super