Factory & Dispatch Presets
Manufacturing Pipeline ($100M Capex)
10,000 units/yr
4.0 MW
4.0 hrs (16 MWh)
$100 M
Grid Stress & Sunset Drop
150 MW/min
28.5 GW
25% (2,500 units)
Factory & Unit Economics
Total Annual Power
40.0 GW
Advanced grid rating
Annual Storage
160.0 GWh
16.0 MWh / system
Factory Capex/kW
$2.50 /kW
Amortized equipment
Peak Deficit Mitigated
74.2%
Peaker run hours -68%
24-Hour California Duck Curve Dispatch
Simulated solar ramp-down, mid-day battery charging, and 6PM-9PM peaker substitution
Baseline Demand
Solar PV
Battery Discharge
Net Load (Post-Storage)
Hour Scrubber:
Hour 19:00 (7 PM) | Net Shaved: 10.0 GW
Hourly Energy Balance Telemetry (GW / GWh)
24-hour synchronized dispatch log| Hour | Gross Load (GW) | Solar PV (GW) | Raw Net Load (GW) | Storage Action (GW) | Final Net Demand (GW) | Fleet SOC (%) |
|---|