Launch Physics
Statcast TrajectoryEvent Presets
• Left: 328 ft (14.3 ft wall)
• Left-Center: 381 ft (11.2 ft wall)
• Center: 400 ft (8.0 ft wall)
• Right-Center: 375 ft (10.0 ft wall)
• Right Line: 328 ft (10.0 ft wall)
Rogers Centre 2D Spray Plot
Landing: 384 ft @ +32.5°Vertical Elevation Arc & Fence Clearance
Wall Clearance: +14.2 ft30-Ballpark HR Tracker
28 / 30Evaluating fence distance & wall height at current spray angle (+32.5°):