Transboundary Himalayan Mudslide & Upstream Risk Cascade Analyzer

Tibet-Nepal Border River Corridor Hydrological & Landslide Dam Overtopping Model

Active Hazard Telemetry
Scenario Presets
Alpine Valley Longitudinal Cross-Section Filling Impoundment
Geomorphic State: Monsoon landslide blocked 65m valley gorge with 55m debris dam crest. Total combined river inflow of 690 m³/s is actively filling the 18.45M m³ reservoir.
Downstream Flood Wave Propagation & Alert Window
Dam Crest Height 55.0 m
Peak Breach Outflow 3,850 m³/s
Surge Arrival (45km) 1.85 hrs
Evacuation Lead Window 5.57 hrs
Hydraulic & Landslide Dam Parameters
55 m
4.20 M m³
480 m³/s
210 m³/s
65 m
45 km
14°
6.5 hrs
Computed Upstream & Breach Hazards
Time to Overtopping 7.42 hrs
Lake Capacity 18.45 M m³
Upstream Inundation 8.20 km
Total Inflow Rate 690 m³/s
Hydrological Engine Note: Calculations utilize Costa-Froehlich empirical breach formulations: Q_p = 0.607 * (V_w^0.295) * (h_w^1.24) combined with Saint-Venant 1D routing wave approximations for transboundary gorge propagation.