TWIS 223 • Dr. Scott Pace Model

Lunar Domain Explorer: Cis-Lunar Logistics & Base Architecture

Surface Site Target
Click on the polar canvas to deploy modules. Position Solar Masts on illuminated ridges and Cryo-Extractors directly inside the Permanently Shadowed Region (PSR).
Deploy Infrastructure Tool
Artemis Accords Governance
Accord Status: Compliant (Article 11)
Cis-Lunar Supply Chain Cadence
Sun Elevation Angle 1.48° (Low Polar)
Active Surface Nodes 7 units
Polar Illumination Avg 88.4% Ridge
Base Power Continuity 100% Nom (RFC Buffered)
Surface Power Grid (Continuous)
Net Power Generated vs Demand 105 kW
Generation: 130 kW Demand: 25 kW
Storage: Regenerative Fuel Cells (RFC) + FSP baseline
ISRU Cryogenic LOX/LH2 Synthesis
Water Extraction & Fuel Yield 13.5 t/yr
Raw Ice Harvested: 16.8 t/yr Propellant Mass: 13.5 t/yr
Sufficient to refuel 0.9 Artemis HLS Ascents per year without Earth upmass.
Cis-Lunar Logistics Delta-V & Supply
Earth → NRHO Gateway ΔV: 3.95 km/s
NRHO → Polar Surface ΔV: 2.45 km/s
Annual Logistics Deficit: 0.0 kg (Net Surplus)
Real-Time Propellant Production Trend
Enjoy this tool? Build your own with Super