Storm & Geotechnical Parameters
El Niño Event Presets
Evacuation & Transit Logistics
Aguas Calientes Population:~4,200 Pax
Santa Teresa Bypass Road:Limited / 4x4 Only
Emergency Staging Base:KM 82 Piscacucho
Accumulated Rain
441.0 mm
Urubamba Peak Flow
682.5 m³/s
Max Huaico Risk
91.4%
Vulnerable Segments
4 / 6
Corridor Segment Geotechnical Telemetry
Bottleneck: KM 88 (Pampa Cahuana Wash)
| Segment Location | Elev (m) | Slope / Substrate | Pore Pressure | Discharge | Hazard Status |
|---|