2nd Alarm Dispatch BOX 0142 | 10-77 HIGH-RISE

NYC Rooftop Blaze Dispatch & Unit Allocation Simulator

Incident: Downtown Manhattan Apartment Building (14 Stories) • Fire Department City of New York Tactical Operations

Incident Status
Contained
Primary & secondary search complete
Containment
98.5%
Rooftop bulkheads insulated
Total Water Flow
1250 GPM
Rooftop Standpipe + Aerial
Response Time
3.4 min
First Due On Scene: 03:24
Property Saved (Est.)
$4.2M
Commercial & Penthouse units
Tactical Rooftop Thermal Map • Sector C / Exposure 2 LAT 40.7128° N, 74.0060° W
Wind Vector NW @ 18 mph
Hydrant → Standpipe 110 PSI → 61 PSI loss
Thermal Core 1150°F → 180°F
Evacuation Status 14/14 Floors Clear
FDNY Dispatch Radio & Tactical Command Log TRANSMISSIONS LOGGED: 6
Hydraulics & Environment Controls Standpipe Calculator
Hydraulic Calculus: Rooftop Elevation Head Loss: -60.6 PSI (0.433 PSI/ft). Standpipe boost pump required for effective 100 PSI nozzle tip pressure.
Assigned Apparatus & Unit Deployment 4 Units Active
Tactical Scorecard & Operational Proof ISO Class 1 Standard
Standpipe Siamese Connection: Charged & Pressurized
Bulkhead Venting Cut (Roof Team): Completed (Trench Cut)
Exposure 2 (Adjacent High-Rise): Protected • Zero Extension
Thermal Core Reduction: -84.3% in 6 min
Report: NYC-FDNY-AAR-BOX0142.json
Enjoy this tool? Build your own with Super