Combined Production Projection
Baseline 7 starts + simulated workload (66.0 Total IP)
Status: Active Simulation
Combined ERA
2.36
±0.00 vs 2.36 baseline
Allowed: 17 ER in 66.0 IP
Projected Total Ks
88
+32 Ks added
Rate: 12.00 K/9 (34.8% K%)
Combined WHIP
0.88
±0.00 vs 0.88 baseline
41 Hits / 17 BB allowed
Total Outings
11
+4 Sim Starts
Est. pitches: 1,020