PA EO-2026

Pennsylvania AI Data Center Siting & Grid Compliance Evaluator

Facility & Site Profile

Spatial Siting & Environmental Matrix

Executive Order Assessment

⚠️ Approved with Water Monitoring Condition
PJM Grid Headroom 150 MW Substation 600 MW reserve
Carbon Intensity 78.4 lbs/MWh 92% Clean Match
Ratepayer Risk Exposure Insulated (Dedicated Private Tariff) No consumer cost-shift
Basin Water Stress Moderate-Low (basin allowance compliant) 1.80 MGD withdrawal
Required Regulatory Mitigations & Action Items
  • Install continuous thermal effluent monitoring sensors
  • Submit PJM dual-feed study within 60 days
Pennsylvania EO Standard Reference: Facilities >100 MW must demonstrate zero ratepayer grid upgrade subsidization, PJM regional transmission margin ≥ 50 MW, and SRBC/DRBC consumptive water permits.