Facility & Site Profile
Spatial Siting & Environmental Matrix
Executive Order Assessment
⚠️
Approved with Water Monitoring Condition
PJM Grid Headroom
150 MW
Substation 600 MW reserve
Carbon Intensity
78.4 lbs/MWh
92% Clean Match
Ratepayer Risk Exposure
Insulated (Dedicated Private Tariff)
No consumer cost-shift
Basin Water Stress
Moderate-Low (basin allowance compliant)
1.80 MGD withdrawal
Required Regulatory Mitigations & Action Items
- Install continuous thermal effluent monitoring sensors
- Submit PJM dual-feed study within 60 days
Pennsylvania EO Standard Reference:
Facilities >100 MW must demonstrate zero ratepayer grid upgrade subsidization, PJM regional transmission margin ≥ 50 MW, and SRBC/DRBC consumptive water permits.