LOGISTICS TAC-SIM v2.4

Forward Airpower Projection & Reach Simulator

Geodesic power projection, aerial refueling anchor calculation, & payload-range analytics
Active Flight Vector (Geodesic Arc)
Refueling Anchor Transit Line
Unrefueled Combat Radius Envelope
Aerial Refueling Anchor (ARIP / AAR)
Operational Target Area
Operational Summary Telemetry STATUS: OPTIMAL
One-Way Transit Dist
-- NM
Roundtrip Flight Time
-- hrs
Refueling Passes Req.
--
Effective Payload @ Target
-- lbs
Total Package Fuel Burn
-- lbs
Logistics Debt Index
--
Flight & Staging Configuration
Payload Degradation Over Distance
Forward vs Staged Base Comparison
Metric Forward Base Staged Base
Transit Distance (NM) 620 NM 2,420 NM
Refueling Passes 0 2
Payload Delivered 12,000 lbs 6,800 lbs
Tanker Fleet Ratio 0.2 per strike 1.8 per strike
Sorties Per 24 Hrs 3.2 0.8
Enjoy this tool? Build your own with Super