Puerto Rico Water Grid PROTOTYPE V2.4

Water Continuity 12 Days
Physical Pipe Leakage 58%
Silt Dredged Volume 0 m³
Uninterrupted Pop. 42%
Remaining Budget $150,000,000
ACTIVE: Normal Operations

Hydro-Resilience Diagnostic Summary

Baseline System Assessment
Service Days (Crisis)
12 Days
Target: 95 Days
Pipe Leakage Post-Repair
58% Loss
Target: 28% Loss
Silt Reduction Vol.
0 m³
Target: 4,500,000 m³
Uninterrupted Pop.
42% Serviced
Target: 84% Serviced