H-TECH

Honda Ridgeline Next-Gen Transition & Architecture Explorer

Official 2026 Lincoln, Alabama Assembly Retooling & Gen 3 Engineering Intelligence

2026 Pause Confirmed

Generation & Transition Roadmap (2005 – 2028+)

SELECT GENERATION ERA
Alabama Lincoln Plant Retooling Window (Late 2026)

Honda officially confirmed that second-generation Ridgeline production will pause in late 2026 at the Lincoln, Alabama manufacturing hub. This production hiatus enables assembly line retooling, robotic weld cell modernization, and supply chain alignment for the next-generation architecture.

OFFICIAL CONFIRMATION Lincoln Plant Line 2 Gen 2 Sunset Tooling Reconfiguration
Late '26
Pause Target
10-Speed
Current Trans
5,000 lbs
Current Tow Max
Lincoln, AL
Assembly Site

Gen 3 Architecture & Powertrain Simulator

Two-Motor e:HEV Hybrid AWD
Chassis Strain & Power Flow Diagram
ICE/M1 e:HEV Battery Module i-VTM4 48.0" FLAT BED WIDTH