South Korea $3.5B Chip Fund Simulator

MEGA CLUSTER ALLOCATOR Yongin • Pyeongtaek • Cheonan
Capital Allocation ($3.5B) $3,500M
Subsidies Infra Packaging R&D
Fab Equipment Subsidies (EUV/Tools) $1,500M
Power & Water Infrastructure $1,200M
Next-Gen Packaging R&D (HBM) $800M
Supply Chain Bottlenecks
Grid Power Supply Delay 6 mo
EUV Tool Lead Time 14 mo
Water Supply Utility Capacity 85%
Mega Hub Activations
Yongin Mega Cluster (300mm Fabs)
Pyeongtaek Expansion Hub
Cheonan Advanced Packaging Hub
Semiconductor Supply Chain Network Node Topology LIVE D3 SYSTEM FLOW
Mega Hubs
Utilities (Power/Water)
Equipment & Substrates
Active Wafer Flow
Computed Fab Outcomes MODEL ACCELERATION
Activation Target 2027.8 -1.2 Yrs vs Base
Wafer Capacity 485k Wafers / Month
Grid Utility Load 78.4% Stable Supply
Global Share Delta +3.45% HBM & Foundry
Strategic Blueprint Evaluation
OPERATIONAL OPTIMAL

The $3.5B deployment achieves optimal balance between Yongin power grid buildout and Cheonan HBM packaging R&D. EUV lead times are offset by $1.5B tooling subsidies, positioning cluster activation for Q4 2027.

Exportable Data Schema
{
  "fund_allocation_m": 3500,
  "hubs": ["yongin", "pyeongtaek"],
  "activation_year": 2027.8
}
Enjoy this tool? Build your own with Super