SLC-4E

Falcon 9 USSF-259

SYSTEMS NOMINAL
LAUNCH SITE: California (SLC-4E)

Live Cryogenic & Telemetry Profiler

ULLAGE: 38.5 PSI
Mission USSF-259 Ground Status: Falcon 9 countdown sequence active at Vandenberg Space Force Base SLC-4E. All cryogenic propellant loading protocols, chilled LOX, densified RP-1, and stage pressurization are synchronized.
CHAMBER & ULLAGE HISTOGRAM STATUS: LIVE 60Hz
LOX Tank Pressurization (PSI)
RP-1 Densification Temp (°C)
Ullage Stability Curve

Launch Readiness Verification

System Readiness Status
GO FOR LIFTOFF
Atmospheric & Weather Profile
95% FAVORABLE - WINDS NOMINAL
Cryogenic Propellant State
TANKS FULL & PRESSURIZED
Calculated Readiness Index
100%
Source: @SpaceX Status Update (USSF-259) Baseline Model: 95% Weather Favorability

Launch Director Console

POLL: GO
COUNTDOWN CLOCK (CALIFORNIA SLC-4E)
T-00:19:00
Telemetry export saved: USSF-259_Launch_Readiness.json
Weather Favorability 95%
Marginal (30%) Target Baseline (95%) Optimal (100%)
Liquid Oxygen (LOX) Tank Load 100%
Rocket Propellant 1 (RP-1) Tank Load 100%
Stage 1 & 2 Ullage Pressure 38.5 PSI
Upper Level Wind Shear 8 kts (Nominal)
Cryo Temperature (LOX) -207.1 °C
RP-1 Densification Temp -7.2 °C
Range Safety Carrier Lock GREEN / VERIFIED
Enjoy this tool? Build your own with Super