Infrastructural Audit Simulation 30-Day Total Blackout Scenario

30-Day Technological Outage Impact & Continuity Planner

Evaluate critical systemic dependencies across municipal water pumping, physical cash liquidity, internal combustion transport (ECUs), and food distribution channels during a 30-day disappearance of modern digital infrastructure.

Community Archetypes:
Preparedness Levers Live Adjustments
3 Days
Generator diesel reserves powering city water filtration & pressure pumps
15%
Local currency physical circulation vs digital ledger balances
5 Days
Neighborhood gravity cisterns and household potable reserves
30 / 100
Non-electronic freight capability (mechanical vehicles, non-ECU, draft transport)
Systemic Resilience Horizons T+30 Days Analysis
Water Crisis Hour
72
Hours until pressure pump failure
Financial Freeze Day
Day 1
ATM & card transaction shutdown
Systemic Resilience Score
42.5%
Multivariate survivability index
Food Supply Depletion
Day 2
Just-in-time logistics exhaustion
Vulnerability Assessment
High Vulnerability: Severe municipal and liquidity risk within 72 hours.
Critical Failure Horizons Across 30 Days Day 0 → Day 30
Potable Municipal Water Exhaustion at 72h (Day 3)
Retail Cash & Commerce Liquidity Freeze: Day 1
Food Supply & Distribution Shelf Depletion: Day 2
Emergency Comms & Order Mechanical Coordination: Low
Cascading Failure Analysis: Day-by-Day Progression Empirical Infrastructure Dependencies
Outage Horizon Primary Sector Direct Consequence Status in Simulation
Day 0 - Hour 1 Avionics & Traffic ECUs, signal grids, and modern fly-by-wire aviation systems lose computational telemetry. Immediate Freeze
Day 1 Banking & Transactions ATM switch networks and POS credit rails disconnect; economy defaults strictly to physical pocket cash. Complete Freeze
Day 2 - 3 Grocery & Water Pumping Municipal diesel backups burn out; high-rise water pressure drops to zero; store shelves empty. Critical Depletion
Day 7 - 14 Sanitation & Medical Sewage pumping overflows without grid power; cold-chain insulin and pharmaceuticals spoil. High Vulnerability
Day 30 Systemic Restoration Cold-start grid restart required; supply line reconstitution takes months. Reconstitution Phase
Enjoy this tool? Build your own with Super