AUKUS Defense Pact Timeline & Industrial Readiness Simulator

BILATERAL ALIGNMENT: 92% (FULL STEAM AHEAD)
RAN Deterrence Gap Risk
LOW (0.8 YRS)
HMAS Collins Class to SSN Bridge Safe
Target Submarine Fleet (2040)
5 SSN HULLS
3 Virginia + 2 SSN-AUKUS in Yard
US/UK Shipyard Stress Index
1.85 BOATS/YR
EB & Newport News Cadence
Pillar 2 Tech Maturity
72% INTEGRATED
Ghost Shark XL-AUV in lead
STRATEGIC TIMELINE & DETERRENCE ENVELOPE (2025–2055)
Scrub the timeline or modify stress parameters to reproject force transitions.
PHASE 2: VIRGINIA TRANSFER
Milestone Trajectory & Sovereign Transfer Ledger 4 CORE MILESTONES

🛡️ Sovereign Capability Continuity

Under current parameters (US Build Cadence 1.85 boats/yr, Alignment 92%), Australia successfully transitions from the Collins-class Life-of-Type Extension (LOTE) to the first transferred Virginia-class hulls with minimal deterrence gap risk.

  • Collins LOTE bridge requirements: Nominal 2038 retirement.
  • Osborne Yard Infrastructure: On schedule for 2038 steel cutting.
  • SRF-West (HMAS Stirling): Rotational port certified for 2027.

Critical Path Risk Analysis

The primary vulnerability remains US shipyard throughput (Submarine Industrial Base). Should US shipyard delivery fall below 1.5 boats/year, US Congressional 'no transfer without domestic replacement' triggers will delay Virginia deliveries to RAN.

  • Pillar 2 Autonomous Offset: Ghost Shark XL-AUV provides early asymmetric undersea mass.
  • ITAR Exemption Friction: Streamlined bilateral licensing operative.