TRILATERAL DEFENSE PACT

AUKUS Strategic Architecture & Industrial Readiness Simulator

Pillar 1 (SSN Roadmap) & Pillar 2 (Advanced Capabilities) • 2023–2055+
Active RAN SSN Fleet Phase 2: Virginia
3 Hulls Operational
Transition Gap Risk MODERATE
24% Collins LOTE overlap
Annual Indo-Pacific Patrol Days Target: 720d
540 days/yr
US/UK Shipyard Strain Index Max: 100
72 pts (High Load)
Multi-Decade Force Structure Pipeline
SCRUB CHRONOLOGY (2023 - 2055+) Year: 2032
2032
2032

Phase 2: First US Virginia-Class Transfer

Transfer of first US-built Virginia-class SSN to the Royal Australian Navy (RAN). Submarine Rotational Force-West (SRF-W) operational at HMAS Stirling with joint USN/RN rotations.