BLOCKADE ACTIVE

Port of Dover Access Chokepoint & Corridor Contingency Navigator

Blockaded Corridor / Heavy Queue
Dover TAP 40mph Buffer (A20)
Strategic Diversion to Folkestone Le Shuttle
Active Incident Intelligence Ref: BBCBreaking 2096148070

A20 / Eastern Docks Freight Ingate Roundabout: Masked protester blockade restricting cross-channel Ro-Ro departures.

Inbound Freight: 480 HGV/h Gate Clearance: 60 HGV/h
Queue Propagation & Dover TAP Buffer
Net Accumulation Rate
420 HGV/h
Inflow minus restricted throughput
TAP Buffer Saturation
0.86 hrs
500 HGV capacity limit
Projected Queue (3h)
1,400 HGVs
Includes 140 initial queue
Tailback Length (4h)
23.5 km
@ 13m effective footprint
Contingency Flow Parameter Controls
Blockade Severity (% capacity cut) 89%
Inbound Freight Flow (HGV / hr) 480
Perishable / Reefer Share (% cold chain) 35%
Cold-Chain Reefer Fuel & Demurrage
Total Reefer Fuel Burn (6h)
4,687.2 Liters
2.8 L/hr generator idling burn
Spoilage Vulnerability Risk
HIGH RISK
Queue dwell > 5.5h threshold
Multimodal Diversion Recommendation
Primary Diversion: Folkestone Eurotunnel Le Shuttle (Freight)
Delay Avoidance vs Dover Stoppage: 3.4 hours saved
Corridor Option Road Detour Total Crossing Time Status
Portsmouth Int'l
Western Channel Ferry
198 km 5h 45m crossing Standby
Harwich Int'l
Hook of Holland Link
172 km 7h 15m crossing Viable for North
Operational Advisory Dispatch

Generate structured freight guidance for transport managers, telematics routing units, and drivers heading for the Kent port cluster.

Operational Advisory Exported Successfully. Local Hash Generated.
Grounded on BBC News: Dover access blockade Source Post
Enjoy this tool? Build your own with Super