European Power Grid Interconnect 2.0

Grid Frequency 50.00 Hz
Total Demand 290.0 GW
Total Supply 310.0 GW
Cross-Border Flow 14.2 GW
Unserved Energy 0.0 GW
Active Flow (<80% Cap)
Heavy Load (80-99% Cap)
Congested Corridor (100%)
Regional Node (Click to Inspect)

European Power Grid Interconnect & Capacity Simulator — Analysis

Bottlenecked Interconnects

0 Corridors

No transmission corridors running at full 100% capacity constraint.

Regional Price Dispersion

€0.00 / MWh

Max spot price spread between surplus and deficit markets.

Overall Grid Health

STABLE (50.00 Hz)

All regional load demands fully satisfied across cross-border interconnects.

Enjoy this tool? Build your own with Super