Interactive Cross-Section: Drag water pump depth or probe vector
Trapped Crown Air Pocket (Inverted Sill)
Hydrostatic Flood Inundation (Glacial Melt)
Directional Rescue Borehole (Ø 150mm)
Submersible Dewatering Discharge Vectors
Operational Timeline
Day 10 • Hour 240 (Extraction Phase)
240.0 hrs
0h (Flood Ingress) 48h (Pocket Seal) 96h (Borehole Spud) 168h (Day 7 Breather) 240h (Day 10 Extraction)
Discharge: 650 m³/h
Ventilation: Active (Day 6)
Inflow: 390 m³/h
Metabolic O2: 0.28 L/min
Operational Counterfactual Presets Source-Grounded Hydro-Scenarios
Trapped Pocket Atmosphere Survivable
CO2 Concentration
3.8%
Hypercapnia Ceiling: 5.0%
O2 Partial Pressure
17.2 kPa
Min Hypoxia: 13.0 kPa
Air Pocket Volume
180.0 m³
Crown Cushion Volume
Max Survival Limit
248.5 hrs
10.35 Operational Days
Vital signs viable. Crown air seal intact with borehole fresh air delivery line.
Tunnel Hydrology & Drainage Net Dewatering
Inflow Equilibrium
420 m³/h
Sediment-burdened runoff
Pump Net Clearance
+260 m³/h
650 cap - 390 inflow
Tunnel Water Sump
1.4 m
Extraction Crest: < 1.8 m
Hypothermia Buffer
9.2°C
Ledge elevated 1.1m
Dewatering capacity exceeds glacial inflow. Ingress tunnel passable by dive teams.
Operational Incident Grounding
On the Himalayan Nepal-China border, catastrophic glacial-lake burst and flash floods engulfed a run-of-the-river hydropower construction adit. Rescuers successfully pulled a Chinese national worker alive after 10 days (240 hours) trapped subterranean.
Subterranean ParameterObserved Value
Extraction DayDay 10 (Hour 240)
Water Sump Clearance420 m³/h capacity threshold
Final CO2 Equilibrium3.8% (Target < 4.0%)
Rescue OutcomeOperational Success (Live Extraction)