Active Operation

Hydropower Tunnel Rescue Operations Simulator

Incident: Day 9 Milestone Extricated: 2 Trapped: 12 Penstock Length: 450m
Subterranean Longitudinal Section (450m Penstock Incline)
Floodwater Pool Silt Debris Plug Trapped Air Cavity Micro-Borehole Probe

Operational Triage Controls Direct Manipulation

High-Head Slurry Pump Throughput 250 m³/h
Excavator Muck Clearance Speed 2.0 m/h
Forced Fresh Air Ventilation 140 m³/min

Subterranean Physical Telemetry Real-Time Hydro-Pneumatics

Barrier Clearance
15%
18m / 120m silt plug
Projected Breach
58h
At active advance rate
Survivor Reserve
76h
O2 & hydration buffer
Atmospheric O₂
17.8%
Safe floor: 16.0%
Water Depth (Adit)
14.5m
Head pressure: 1.42 bar
Structural Risk
Moderate
Air Pocket: Stable

Incident Timeline & Rescue Feed