Reservoir Elevation Control
Datum: USBR NGVD29
Water Surface Elevation
1,039.4
ft MSL
Distance to Dead Pool
+144.4 ft
Hydrological Threshold Presets:
Active Storage
7.02 MAF
27.1% Capacity
Hoover Hydropower
1,380 MW
33.3% Derated
Total Shortage Cuts
617,000 AF
DCP + '07 Interim
Hydraulic Head
409.4 ft
Tailwater 630 ft
Lower Basin State Delivery Reductions
| Basin Entity | Normal Apport. | Cutback (AF/yr) | Net Delivery |
|---|
Hoover Dam & Lake Mead Bathymetric Profile
Drag water line or scrub slider
Active Water Body
Dead Pool (895 ft)
Min Power Pool (950 ft)
Upper Intake (1,050 ft)
Forward Mass-Balance Trajectory Engine
Glen Canyon Release × Consumptive Demand
Net Annual Storage Delta:
-0.87 MAF/yr (-11.2 ft/yr)
Projected Months to Dead Pool:
~154 Mos