204-Assembly CE PWR Core Lattice
Position: Hover Lattice
STEP: 204/204
Reactivity Telemetry (Mode 6)
Subcritical Valid
Multiplication Factor (k-eff)
Tech Spec Limit: ≤ 0.950
0.920
Shutdown Margin (SDM)
Min Tech Spec: > 3,500 pcm
4,120 pcm
Source Range Detectors
NI-001 • NI-002 Channels
34.8 cps
Soluble Boron Concentration 2,450 ppm
1,800 ppm (Dilution limit) 2,450 ppm (Target) 3,000 ppm (Heavy Borated)
Fuel Inventory Loading State:
Fresh Enriched Batch: 68 / 68 loaded
Partially Burned Batch: 136 / 136 loaded
Unloaded Lattice Cell: 0 empty
Control Element Assemblies (CEA): 45 Clusters Banked
NRC Technical Specification 6-Mode Operational Progression
Current Plant Gate: Mode 6 (Refueling)
Mode 6 Active
Refueling
k-eff ≤ 0.95 • Tavg ≤ 140°F
Mode 5 Pending
Cold Shutdown
k-eff < 0.99 • Tavg ≤ 200°F
Mode 4 Pending
Hot Shutdown
k-eff < 0.99 • 200°F - 300°F
Mode 3 Pending
Hot Standby
k-eff < 0.99 • Tavg ≥ 300°F
Mode 2 Pending
Startup
k-eff ≥ 1.00 • Thermal ≤ 5%
Mode 1 Pending
Power Operation
k-eff = 1.00 • Thermal > 5%
Critical Mode 6 Surveillance & Startup Prerequisites:
Startup Physics Testing Critical Path vs. March 2027 Commitment
184 Testing Days Planned
Aug 2026 (Fuel Reload) Nov 2026 (Cold Hydro / Vent) Jan 2027 (Zero-Power Physics) March 2027 (Power Commitment Deadline)
1. Primary Loop Fill & Vent
30 Days (Complete)
2. Cold Hydrostatic Testing
25 Days (In Progress)
3. CEA Scram Timing & Calibration
28 Days
4. Zero-Power Physics Testing (ZPPT)
45 Days
5. Power Ascension Physics (to 100%)
56 Days
DEADLINE
Testing Window
184 Days
Schedule Buffer
92 Days Ahead
Estimated Grid Sync
Q4 2026 - Q1 2027
Core Sequence Valid
TRUE (PASS)
NRC Compliance Manifest: Validated for Holtec Palisades Restart Licensing Submittal.