Texas Hybrid Gas & BWRX-300 SMR Simulator 2.5 GW Hybrid Architecture

Simulating staged modular nuclear commitment (5×300 MWe) & gas turbine load tracking
Grid Hour Demand
2,200 MW
Hour 14:00 (Peak)
Nuclear Baseload
1,500 MW
68.2% of demand
Gas Peaker Output
700 MW
5,040 MMBtu/hr
CO₂ Emissions
268 t CO₂/h
Abating 575 t/hr vs All-Gas
Blended Power Cost
$53.8 /MWh
300 MW Spinning Res.
24-Hour Real-Time Stacked Unit Dispatch & Tracking Timeline Cursor: 14:00
Scrub 24h Grid Timeline: 14:00
BWRX-300 SMR Nuclear Baseload
Natural Gas CCGT / Peaker
Unserved Load / Deficit
ERCOT Net Demand Curve
Current Scrubber Hour
Hourly Thermal Commitment & Emissions Breakdown Daily Total: 52.8 GWh | 6,432 t CO₂
Hour Demand (MW) Nuclear (MW) Gas Gen (MW) Unserved (MW) Gas Fuel (MMBtu) CO₂ (tons/hr) Cost ($/MWh)
Enjoy this tool? Build your own with Super