Operational Presets
Pipeline Parameters
Turnaround Telemetry & Projected Cadence
Cycle Duration
28 days
Target: Early Sept
Pad 2 Monthly Rate
1.1 / mo
Single Mount
Dual-Pad Potential
2.4 / mo
Target 2027
Annualized Launches
13 flt/yr
Pad 2 Active
Starbase Stage Turnaround Timeline (Days from Flow Start)
Hover stage for detailsSimulated Starbase Launch Manifest (Next 6 Missions)
| Flight | Ship / Booster | Mount | Turnaround (Days) | Target Launch | Est. Interval |
|---|