Verified architectural and industrial load projection for the proposed 100M sq ft Terafab semiconductor manufacturing facility in Texas.
EQUIVALENT FOOTBALL FIELDS
1,730 Fields
ESTIMATED ANNUAL WAFERS
3,000,000 Wafers
PEAK POWER REQUIRED
1.20 GW
SOLAR ROOF YIELD
1,450 GWh / yr
CLEANROOM FOOTPRINT
35,000,000 sq ft