Megacharger

Tesla Semi Fleet Megacharger Planner

Peak Depot Grid Load
9.0 MW
12 simultaneous stalls
Avg Turnaround Time
42.5 mins
Target SOC: 80% range
Total Daily Energy
6.86 MWh
1.10 kWh/km heavy duty
Est. Daily Energy Cost
€ 1647.24
€0.240 / kWh industrial
Fleet Readiness Status
Optimized Fleet Ready
Megacharger depot compliant
Depot Grid Load Profile (24-Hour Cycle)
Peak: 9.0 MW Draw
Simulated Depot Megacharger Bay Allocation
Turnaround Window: 42.5 min per tractor
Bay Assignment Tractor ID Energy Delivered Depot Arrival SOC Departure Target Duration Energy Cost
Based on official Tesla Charging for Business expansion: Germany, Netherlands, Belgium, France, UK. Reference efficiency: 1.10 kWh/km @ 37 tonnes Gross Vehicle Weight.
Report downloaded
Enjoy this tool? Build your own with Super