Simulation Control & Hydrology Inputs
Downstream Impact Telemetry
Peak Conc. @ 1.2km
342.5 ppm
Peak Arrival Time
8.2 hrs
Remediation Radius
6.8 km
BOD Spike Index
Severe (High)
Sampling Station Hydrograph (1.2 km)
Environmental Fate Assessment
High biological oxygen demand spike; rapid localized degradation with severe localized aquatic hypoxia risk.