Facility & IT Parameters
120 MW
85%
150 MW
Ambient Climate & Zoning
32 °C
45%
300 m
Grid Electricity
Chip Thermal Dissipation
Cooling Hydronics
Thermodynamic Telemetry
IT Power
102.0MW
Total Facility Power
122.4MW
Operating PUE
1.20
Grid Headroom
27.6MW
Water Draw
1.26MGD
Water Efficiency (WUE)
1.95L/kWh
Boundary Noise (at buffer distance)
58.4dBA
Municipal Friction & Compliance
⚠️ 2 Friction Flags Identified
  • Elevated evaporative water draw in warm climate (>1.0 MGD)
  • Boundary noise exceeds suburban night threshold (55 dBA)
Engineering Principle: 100% of computational electrical energy turns into low-grade sensible heat. Cooling equipment (compressors, CRAC fans, pumps) adds parasitic overhead.